Ongoing construction projects in the Town of Paradise for the period of June 8-14 include:
Karwood Roundabout: Due to the impending forecast, paving scheduled for Saturday, June 8 is postponed. An update will be provided when the work is rescheduled.
Topsail Road Roundabout: Work on the traffic lights at the intersection of Topsail Road-McNamara Drive-Clearview Heights is scheduled for Monday, June 10. The traffic lights will be deactivated at 9 a.m. and return to service by 4 p.m. Traffic control will be in place throughout the work. For the remainder of the week, working will continue along the shoulders of the road at the McNamara Drive and Topsail Road intersection. For this portion of work, no traffic interruptions are expected.
McNamara Drive: Road work and sewer upgrades continue on McNamara Drive and drivers may experience traffic slowdowns. This portion of work is expected to conclude in the next couple of weeks.
Clearview Heights: Road upgrades have started and a detour is in place for the duration of this construction project.
Paradise Road: Work is ongoing for Phase III upgrades to the section of road between Stormont Street and Archibald Drive. The ditches have been filled to create as much room as possible for traffic through the construction zones. Traffic delays are expected as the nature of this work makes it impossible to maintain a lane of traffic in each direction all the times.
Peter Barry Duff Memorial Park: Light Installation work continues with expected completion at the end of June.
Paradise Park: Work is ongoing for the installation of the new gate and it is expected to be completed by the end of June.
Line painting, regular street upgrades / paving and water and sewer work on O’Brien’s Way are ongoing throughout the construction season.